Summer students employment opportunities

The Shediac Bay Watershed Association is looking for summer students for its 2017 season. There are two positions available a research assistant and an outreach coordinator. More information can be found in the following job postings: Research assistant, outreach...

Water quality in Shediac Bay – Rectifying the facts

In response to all the media attention around water quality issues in Shediac Bay, the board of directors would like to issue the following document to clarify the facts regarding our position around this issue:  Rectifying the facts (bilingual document)....
Beach Sweep 2016

Beach Sweep 2016

We would like to THANK All the Wonderful Volunteers who came out to help cleanup our Beautiful Coastline on June 11 2016! Approximately 4 km was cleaned and about 25 garbage bags were filled with junk! A BIG THANKS to the Ville de Shediac / Town of Shediac, Coop...
Interpretation Panels for Biodiversity

Interpretation Panels for Biodiversity

As part of our Biodiversity Enhancement Program in the Town of Shediac, we have created 3 interpretation panels in 3 locations. A BIG THANK YOU to our designer Brian Branch (Branch Graphic Design), Charles LeGresley for the photos and coordination, and Maximum Signs...
Tern platform aerial view

Tern platform aerial view

Some AMAZING Arial Photos of the SBWA’s Tern Platform taken by Lewnanny Richardson’s Drone, of Nature NB. A Very BIG Thank You from Everyone at the Shediac Bay Watershed...
Electrofishing 2015

Electrofishing 2015

The SBWA has been doing electrofishing surveys as part of our restoration work and fish population monitoring. We do these surveys immediatly after restoration work in a degraded habitat, to get a snapshot view of the current state of fish populations in that area....
Stream Stabilization of the Dionne Brook

Stream Stabilization of the Dionne Brook

This restoration work was done on a section of the Dionne Brook, a tributary of the Scoudouc River. There is a severely eroding meander that was targetted for stabilization, as it released heavy load of sediment in the river. The work includes the construction of an...